|
AnaeCo is pleased to announce that Sinclair Knight Merz (SKM) the independent engineer appointed to the Western Metropolitan Regional Council (WMRC) Stage 1 project has issued the Final Certificate of Satisfaction. This certificate is independent verification that the DiCOM process has satisfactorily met the contractual performance trials enabling the WMRC project to proceed to Stage 2. Stage 2 will expand the existing facility’s capacity threefold.
This independent certification validates key technical claims made by AnaeCo about
the DiCOM process including its production of renewable energy in excess of the
plant’s internal requirements as well as the ability to produce high quality compost
from organic material sourced from mixed household waste.
Tom Rudas, the Managing Director of AnaeCo said “The most satisfying aspect of the
certification process has been the ability of the AnaeCo team to take a new
technology, previously unproven at commercial scale, construct a facility and then
demonstrate its successful performance in such a short time frame.”
Prof. Michael Dureau, Chairman of AnaeCo said “AnaeCo is now well on its way to
becoming a world recognized innovator in the conversion of municipal and industrial
solid waste to high value resources.”
The DiCOM System is proven at full scale to deliver significant commercial
advantages to the Alternative Waste Technology sector.
To download the full document, please click the following link :
DiCOM System achieves independent engineer Final Certificate of Satisfaction
|